top of page
Redcliff Quarter Phase 1
Client | Sector | No. of Beds | No. of Storeys | Architect | Structural Engineer | Main Contractor | Mechanical Contractor | Electrical Contractor |
---|---|---|---|---|---|---|---|---|
Change Real Estate | Residential | 128 | 8 | LSH | Arup | Galliford Try | Laneways | Laneways |
The development forms the first phase of the regeneration of the Redcliff area in Bristol and consists of two ānā shaped residential blocks, located over a shared ground floor and covered car park with retail units on both St. Thomas Street and Redcliff Street.
Services highlights:
Planning support including SAP calculations and thermal modelling
Energy strategy and Solar PV report
Planning achieved with electric heating
Complete scheme design of all building services (heating/cooling, ventilation, domestic water services, public health, power, lighting, fire detection and data services)
Building incorporated solar PV arrays
Comfort cooling with air source heat pumps to duplex and penthouse apartments
bottom of page