Packing Hall 4 and 5 Implementation
Client | Sector | No. of Beds | No. of Storeys | Architect | Structural Engineer | Main Contractor | Mechanical Contractor | Electrical Contractor |
---|---|---|---|---|---|---|---|---|
TEVA UK LTD | Industrial | N/A | 1 |
Applied Energy was commissioned to survey and investigate the existing air handling plant serving Packing Halls 4 and 5 to resolve issues of poor ventilation and humidity control.
Services Highlights:
Updating of record drawings to match current installed arrangement.
Air flow tests of the entire system
Recommissioning of the chilled water services
Detailed review of potential for including dehumidifies to closely control humidity levels within the packing halls.