The Vantage Nottingham
Client | Sector | No. of Beds | No. of Storeys | Architect | Structural Engineer | Main Contractor | Mechanical Contractor | Electrical Contractor |
---|---|---|---|---|---|---|---|---|
Future Generation | Student Accommodation | 485 | 12 | Axis Architects | N/A | McAleer & Rushe | NWP | NWP |
Demolition of existing buildings and erection of a part 5, part 6, part 10 and part 12 storey building comprising 485 student apartments.
Services Highlights:
Concept stage design with architects to meet planning and client requirements
MEP designed to incorporate and use local district heating network to provide the sites heating and hot water needs
Sprinkler system installed throughout to BS12845
Complex smoke ventilation system to accommodate habitable basement areas
Complete pre-tender MEP design inclusive of ventilation/air conditioning/public health/lighting/small power and emergency back up services
Detailed corridor layout fully developed in REVIT
Development of Brand Standards which were adopted across multiple sites across the country